04/20/96
The DC-8 and ER-2 flew a coordinated cirrus cloud profiling mission over the
CART site, where only patchy, optically thin cirrus (and halos) were observed
during the entire day. Both ER-2 and DC-8 flew up/down-wind legs over the
CART site. Only the first leg was coordinated for a radiation measurement
time-series, with the DC-8 below the cirrus deck.
For the cirrus profiling the DC-8 ascended in an up/down-wind flight-leg
racetrack pattern and descended in slow spirals near the CART-site.
The ER-2 observed lots of cirrus and contrails over the CART site.
One of the contrails extended over 37km. The DC-8 observed cirrus over
CART site. Ground observations indicated that the DC-8 made persistent
contrails in temperatures as high as -38C in patchy cirrus.
The T39 flew a test flight to test the chemical ionization mass spectrometer
system.
Highlights
Flight Reports
CART Site
Back to Daily Summaries list