April 20, 1996
Mission Objective
T-39 Flight 05
- To check the newly installed chemical ionization mass spect system.
Flight Log
TAKEOFF/LANDING:
The T-39 departed SLN at 1800UTC and returned at 2000UTC
FLIGHT REPORT:
The T-39 flew to 41kft to observe the performance
characterstics of the CIMS instruments.
METEOROLOGY-REPORT:
INSTRUMENT STATUS:
- CIMS - mass spec - WORKED
- MS - Met/Nav system - WORKED
- AMS - Air Motion Sensor - WORKED
- NDIR - CO2 - WORKED
- 3760 - fine CN - WORKED
- 3025 - ultra fine CN - WORKED
- FSSP - 0.3-20um aerosols - Software probelem
- PCASP - 0.1-3um aerosols - WORKED
Highlights
- The T-39 was able to perform needed instrument checks.