April 16, 1996
Mission Objective
T-39 Flight 03
- Produce contrails for in situ sampling by the DC-8
Flight Log
TAKEOFF/LANDING:
The T-39 separted SLN at 16:59UTC and returned at 20:06UTC
FLIGHT REPORT:
The T-39 flew to a position 10mi. west of the CART site and executed
a series of 10mi. diameter circles at 35, 37, and 39kft.
METEOROLOGY-REPORT:
Fairly dense cirrus at 29-30kft. Patchy cirrus at 32-36kft. Contrails
were persistent only in regions of cirrus.
INSTRUMENT STATUS:
- CIMS - Not yet operational
- MS - Met/Nav system - WORKED
- AMS - Air Motion Sensor - WORKED
- NDIR - CO2 - WORKED
- 3760 - fine CN - WORKED
- 3025 - ultra fine CN - WORKED
- FSSP - 0.3-20um aerosols - WORKED
- PCASP - 0.1-3um aerosols - WORKED
Highlights
- Accomplished low altitude rendezvous with the DC-8 and
satisfactory formation flight.
- Made several dozen crossings of the DC-8 plume at
separations of 0.8 to 8 miles.
- Observed large concentrations of volatile ultra fine
particles at all distances behind the DC-8.
Back
to daily summary for 04/16